DL/T5231-2010±800kV及以下直流输电接地极施工及验收规程(英文版)
中国电力企业联合会更新时间:2020-09-25 11:12:31
最新章节:12.4 Hand-over of Works封面
版权信息
Forewords
1 Scope
2 Normative References
3 Terms
3.1 Earthing Conductor
3.2 Earth-termination system
3.3 Earthing
3.4 Earthing Resistance
- APP免费
3.5 Earth electrode
- APP免费
3.6 Step Potential Difference
- APP免费
3.7 Touch Potential Difference
- APP免费
3.8 Equal potential Bonding
- APP免费
3.9 Equal potential Bounding Conductor
- APP免费
3.10 Earthing Electrode Cadweld
- APP免费
4 General Provisions
- APP免费
5 Inspection of Materials and Apparatus
- APP免费
6 Measurement
- APP免费
7 Earth-Rock Works
- APP免费
7.1 Excavation of Electrode Trough
- APP免费
7.2 Excavation of cable manholes,seepage wells and inspection wells
- APP免费
7.3 Excavation of directly buried cable troughs
- APP免费
7.4 Backfilling
- APP免费
8 Welding Works of Earth Electrodes
- APP免费
8.1 General Provisions
- APP免费
8.2 Welding Materials
- APP免费
8.3 Arc welding procedure
- APP免费
9 Cadweld Works of Earth Electrodes
- APP免费
9.1 General Provisions
- APP免费
9.2 Preparation for Construction
- APP免费
9.3 Construction Process
- APP免费
9.4 Inspection Method
- APP免费
10 Laying of Carbon Beds
- APP免费
11 Construction and Installation of Cable Manholes,Seepage Wells and Inspection Wells
- APP免费
12 Acceptance,Test and Hand-over of Works
- APP免费
12.1 Acceptance of works
- APP免费
12.2 Completion Test
- APP免费
12.3 Delivery of Documents
- APP免费
12.4 Hand-over of Works
更新时间:2020-09-25 11:12:31