DL/T5235-2010±800kV及以下直流架空输电线路工程施工及验收规范(英文版)
住房和城乡建设部更新时间:2020-09-25 11:19:40
最新章节:10.4 Project Transfer After Completion完结共30章
倒序
封面
版权信息
Foreword
1 Scope
2 Normative References
3 Inspection of Raw Material and Equipment
4 Survey
- APP免费
5 Earthwork
- APP免费
6 Foundation
- APP免费
6.1 General Provisions
- APP免费
6.2 Cast-in-site(CIS)Foundation
- APP免费
6.3 Cast-in-drilled-hole(CIDH)Pile Foundation
- APP免费
6.4 Rock Foundation
- APP免费
6.5 Winter Construction
- APP免费
7 Tower
- APP免费
7.1 General Provisions
- APP免费
7.2 Steel Towers
- APP免费
8 Installation of Overhead Conductors and Ground Wires
- APP免费
8.1 General Provisions
- APP免费
8.2 Tension Stringing
- APP免费
8.3 Connection
- APP免费
8.4 Wire Tightening
- APP免费
8.5 Installation of Accessories
- APP免费
8.6 Installation of Optical Fiber Composite Overhead Ground Wires(OPGW)
- APP免费
9 Grounding
- APP免费
10 Acceptance and Transfer
- APP免费
10.1 Acceptance
- APP免费
10.2 Test on Completion
- APP免费
10.3 Transfer of Documents
- APP免费
10.4 Project Transfer After Completion
更新时间:2020-09-25 11:19:40