- GB50402-2007烧结机械设备工程安装验收规范(英文版)
- 中国冶金建设协会
- 109字
- 2021-04-04 09:17:06
4 Equipment and Material Mobilization
4.1 General Requirement
4.1.1 This chapter is applicable to mobilization acceptance for equipment and material of engineering installation of sintering mechanical equipment.
4.1.2 To transport and lift equipment,lifting point shall be of the indicated positions on equipment or package.Protective measures shall be taken to protect the equipment from damaging during transportation and hoisting.
4.1.3 Prior to installing equipment,O.P.I shall be done and O.P.I record shall be formed.Close attention shall be paid for protecting equipment after O.P.I;the equipment shall be installed timely.
4.1.4 Raw materials entering site shall be stored in order according to their specifications;measures shall be taken to avoid damaging.