5.2 Constant Feeder
General Item
5.2.1 Belt conveyor scale for constant feeder,its adjustment and calibration shall meet requirements in design technical document.
Check quantity:to check all.
Inspection method:to check adjustment and calibration record,and to measure real value.
5.2.2 Tolerance for installation of constant feeder shall meet requirements in Table 5.2.2.
Check quantity:to check all.
Inspection method:see Table 5.2.2.
Table 5.2.2 Tolerance for installation of constant feeder
Table 5.2.2(Continued)
Figure 5.2.2 Belt conveyor scale
1-idler roller;2-weighing roller