6.13 Sealing Slide and Sealing Plate
Ⅰ Dominant Item
6.13.1 Countersunk-headed screw for fixing sealing slide must lower than sliding face of the slide.
Check quantity:to check all.
Inspection method:inspection.
6.13.2 Preset thermal expansion gap for every part of sealing slide,must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation quality records or to take actual measurements.
Ⅱ General Item
6.13.3 Tolerance for installation of sealing slide shall meet requirements in Table 6.13.3,see Figure 6.13.3.
Examination:to check all.
Inspection method:see Table 6.13.3.
Table 6.13.3 Tolerance for installation of sealing slide
Figure 6.13.3 To survey elevation of sealing slide
1-Trolley rail;2-Sealing slide;3-Longitudinal centerline of sintering equipment
6.13.4 Tolerance for installation of plate movable sealing plate shall meet requirements in Table 6.13.4.
Check quantity:to check all.
Inspection method:see Table 6.13.4.
Table 6.13.4 Tolerance for installation of plate movable sealing plate