3 Equipment Foundation,Anchor Bolt and Shim Plate

3.1 General Requirement

3.1.1 This chapter is applicable to quality acceptance for installation of equipment foundation,anchor bolt and shim plate of sintering mechanical equipment.

3.1.2 Foundation must be examined and accepted prior to putting equipment onto it.Equipment must not put onto a foundation which is examined unqualified.

3.1.3 Settlement observation shall be performed for master equipment foundation of sintering mechanical equipment,and settlement record shall be available.