Foreword
In accordance with provisions of 2011 Document for Developing and Revising Standards and Codes on Project Construction(JianBiao〔2011〕No.17)issued by Ministry of Housing and Urban-Rural Development,this Code as the revision of Design Code for Small Hydropower Stations GB 50071-2002,is revised by Water Resources and Hydropower Planning and Design General Institute of Ministry of Water Resources and Sichuan Institute of Water Resources and Hydropower Reconnaissance and Design,together with other concerned organizations.
This Code is comprised of 18 chapters,mainly including general provisions,hydrology,engineering geological investigation,computation of water and hydropower,layout of project and hydraulic structures,hydraulic machinery,heating and ventilation,electrical system,hydromechanical structures,fire protection,construction planning,land requisition and resettlement,environmental protection,soil and water conservation,project management,energy conservation,labor safety and industrial sanitation,cost estimation of project,and economic evaluation,etc.
Revisions made to the previous edition mainly include:
1.The application scope of the code is revised to the design of hydropower stations with installed capacities of 0.5-50MW.
2.Three chapters are added,i.e.soil and water conservation,energy conservation,and labor safety and industrial sanitation.
3.Design provisions are partly revised to make it more applicable to the present situation,following advancement of China in technology and design of small hydropower stations in the last 10 years and satisfying the requirements of current national and industrial policies and regulations.
The articles in boldface in this code are compulsory provisions and must be enforced strictly.
Ministry of Housing and Urban-Rural Development is in charge of administration and interpretation of compulsory provisions of this code;Ministry of Water Resources is in charge of daily management of this code;Water Resources and Hydropower Planning and Design General Institute of Ministry of Water Resources is responsible for interpretation of technical provisions.The code users are kindly requested to collect information from your projects in the application of this code for sharing your experiences.All communications and requests for proposing revision or amendment should be sent to the Water Resources and Hydropower Planning and Design General Institute of MWR(Address:No.2-1,Beixiaojie,Liupukang,Xicheng District,Beijing,Post Code:100120,Fax:010-63206755,Email:jsbz@giwp.org.cn)for our reference in future revision.
This code is mainly drafted by Water Resources and Hydropower Planning and Design General Institute of Ministry of Water Resources,and Sichuan Institute of Water Resources and Hydropower Reconnaissance and Design;assisted by Zhejiang Design Institute of Water Resources and Hydroelectric Power,and Chongqing Surveying and Design Institute of Water Resources,Electric Power and Architecture.
Chief Drafting Staff:
Gao Xizhang Li Changyin Lou Shaocheng Li Xia Li Tao
Li Zifan Zeng Huaijin Wang Xiaoying He Ding'en Li Wanjun
Xiang Chongping Ye Jigang Zheng Changyin Hou Chenggang Tao Hong
Yu Zhiyou Nie Biao Lv Zhongming Zhang Yongjin Diao Zhiming
Fan Weiping.
Chief Reviewing Staff:
Si Zhiming Yao Zhimao Zhang Lei Wang Ying Yue Menghua
Wang Junhai Lei Xingshun Ju Zhanbin Sun Shuangyuan Lin Decai
Tan Zhiyong Wu Jie Tang Hongjie Cheng Wa Jiang Fenghai
Wang Qingming Fei Yongfa Yang Leiqi Zhu Weizhi Han Xiaojun
Wu Shuyan Tang Xinhua Ji Gang Wang Chunman Pu Jikan
Liu Hongyu Lu Yipian Yang Quanming Li Xia Wang Shuisheng
Zhao Qixing Liao Weiwei.