- GB51005-2014水泥工厂余热发电工程施工与质量验收规范(英文版)
- 中华人民共和国住房和城乡建设部
- 47字
- 2021-04-04 09:23:28
6 Steam Turbine and Generator Set
6.1 General Requirements
6.1.1 The travelling crane inside the steam turbine generator workshop has been trial run,and inspected to be qualified by the special equipment supervision and inspection organization.
6.1.2 During construction,the temperature inside the workshop should not be below 5℃.