2 Terms
2.0.1 non-water medium
The medium used in the thermodynamic cycle other than water.
2.0.2 protection cell
The facility that protects the boiler drum,header,valve,and gauge attachment from rain,wind and freeze,etc.
2.0.3 chute
The ash conveying facility at the ash bucket of waste heat boiler,dust separator and other ash-falling place which is connected to the conveying equipment.
2.0.4 dust precipitation chamber
The equipment used to separate and collect the dust particles in flue gas.
2.0.5 engineering design documentation
The documentation that includes construction drawings,equipment and material list and manual,construction instructions,standard drawing handbook,design alternation,etc.
2.0.6 equipment technical documentation
The documentation that includes drawings,specifications,samples,installation instructions,maintenance instructions,operation instructions,measure and analysis report,etc.,provided by suppliers of equipment,instrument,and material.
2.0.7 commissioning & delivery organization
The temporary command organization established in the startup and commissioning phase of the waste heat power station.